google.com, pub-2764582774280019, DIRECT, f08c47fec0942fa0 -
TRK News
No Result
View All Result
  • Home
  • World
  • National
  • Sports
  • Jammu Kashmir
  • Ladakh
  • Health
  • Login
  • Home
  • World
  • National
  • Sports
  • Jammu Kashmir
  • Ladakh
  • Health
No Result
View All Result
TRK News
No Result
View All Result
Home Jammu Kashmir

Successful train runs on Katra-Reasi track bring rail closer to Kashmir

News Desk by News Desk
December 25, 2024
in Jammu Kashmir
A A
0
Successful train runs on Katra-Reasi track bring rail closer to Kashmir
0
SHARES
84
VIEWS
Share on FacebookShare on Twitter

As Kashmir is all set to get rail connectivity, Northern Railway is giving final touches to the groundwork.

As a part of the preparations a successful train run, comprising an engine and goods train, was conducted on the 17-kilometer Katra-Reasi track on Wednesday. “Another trial run of a tower wagon was also conducted on India’s first cable-stayed railway bridge at Anji Khad, which is part of the USBRL (Udhampur-Srinagar-Baramulla Rail Link) project,” a senior Northern Railway official told.

READ ALSO

J-K: Security beefed up ahead of PM Modi’s visit

MHA takes serious note of States, UTs ‘not utilizing’ central funds to help poor prisoners

“The engine trial train ran at 30 km/h, and the goods train at 20 km/h. The trial will continue until the final inspection,” he added.

Another official, who is also part of the train operations on the USBRL project, said that the speed of the engines will be increased in future. “Very soon electric engines will also chug on this line,” he added.

Union Minister for Railways, Ashwini Vaishnaw, posted on X: “Trial run of tower wagon on India’s First Cable-Stayed Railway Bridge at Anji Khad for USBRL Project in J&K.”

While giving the details of the upcoming railway operations on the Udhampur-Srinagar-Baramulla Rail Link officials told that from January 5 to January 6, 2025, statutory inspections will be conducted for the opening of the Katra-Reasi (16.501 km) section. “This section is part of the Udhampur-Srinagar-Baramulla New Broad Gauge (B.G.) Rail Link Project. The inspection will start at 20:50 hrs on January 5 and conclude at 07:55 hrs on January 6,” they added.

The Commissioner of Railways Safety (CRS) is expected to submit an inspection report to the Union Government on January 8.

ADVERTISEMENT

Its in place to mention here that the Phase-I of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) Project, covering the 118-km-long Qazigund-Baramulla section, was inaugurated in October 2009. Subsequent phases included the inauguration of the 18-km-long Banihal-Qazigund section in June 2013 and the 25-km-long Udhampur-Katra section in July 2014.

In February, the first electric train trial run on the Banihal-Katra section of the USBRL project was successfully conducted on approximately 40 km of track and tunnels between Banihal and Sangaldan Railway Stations in Ramban district.

The USBRL Project involves 38 tunnels with a combined length of 119 km. The longest tunnel, T-49, measures 12.75 km, making it the country’s longest transportation tunnel. The project also includes 927 bridges with a combined length of 13 km.

Among these is the iconic Chenab Bridge, with an overall length of 1,315 m, an arch span of 467 m, and a height of 359 m above the riverbed. This bridge stands about 35 meters taller than the Eiffel Tower and is recognized as the world’s highest arch railway bridge—(KNO)

SendShareTweet
Previous Post

Over 5,200 cancer patients registered at SKIMS this year; 50,000 since 2014

Next Post

India Cements promoter N Srinivasan steps down as UltraTech completes acquisition

News Desk

News Desk

READ ALSO

J-K: Security beefed up ahead of PM Modi’s visit
Jammu Kashmir

J-K: Security beefed up ahead of PM Modi’s visit

by News Desk
June 5, 2025
MHA holds review meeting for Amarnath Yatra; drones, dogs, aerial survey to be undertaken
Jammu Kashmir

MHA takes serious note of States, UTs ‘not utilizing’ central funds to help poor prisoners

by News Desk
June 5, 2025
Dry Weather Expected till May 28 in J&K : MeT
Jammu Kashmir

MeT predicts pleasant weather on Eid-ul-Adha in J&K

by News Desk
June 5, 2025
In five years, JK utilizes only 70% of funds for SED: MoE
Jammu Kashmir

In five years, JK utilizes only 70% of funds for SED: MoE

by News Desk
June 5, 2025
Next Post
India Cements promoter N Srinivasan steps down as UltraTech completes acquisition

India Cements promoter N Srinivasan steps down as UltraTech completes acquisition

Congress to release manifesto in next 3 days: PCC Chief Karra

NC’s internal matter: Congress on MP Aga Ruhullah’s protest

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

About Us

Welcome to TRK News, the most-watched television channel in Jammu and Kashmir with a mission to deliver authentic news from around the world. We strive to cover all aspects of news with our firsthand coverage of local, national, and international events. Our team is dedicated to bringing the untold stories to light with unbiased reporting and a commitment to excellence. Join us as we promote the power of informative and inspiring news reporting.

News by Topic

  • Bollywood
  • Business
  • Education
  • Fact Check
  • Health
  • Jammu
  • Jammu Kashmir
  • Kashmir
  • Ladakh
  • National
  • Opinion
  • Sports
  • Technology
  • Tourism
  • Tourism
  • Uncategorized
  • World

Company Info

  • About Us
  • Contact Us
  • Disclaimer
  • Correction Policy
  • Privacy Policy

© 2023 | TRK MEDIA PVT. LTD.

No Result
View All Result
  • Home
  • World
  • National
  • Sports
  • Jammu Kashmir
  • Ladakh
  • Health

© 2023 | TRK MEDIA PVT. LTD.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In